Pre-Start Reactor

Pre-Start Guide

Prepare the RBMK-1500 reactor for a safe and stable startup by completing the Pre-Startup Checklist and configuring all supporting systems.

Overview

Before initiating the reactor startup sequence, it is imperative to complete the Pre-Startup Checklist. The checklist ensures all critical systems are within operational parameters and prevents damage or hazardous events during startup.

Location: The checklist is located on the table beside the control computer. Operators must manually confirm each step is completed—order of completion is flexible.

Recommendation: Review the Control Room Overview for familiarity with systems before beginning.

If you are more of a visual learner, we have added a video at the bottom of the page


Pre-Startup Checklist

1. Condenser Coolant Pumps

2. Turbine Configuration

3. Deaerator A Configuration

4. Main Circulation Pumps

5. Reactor Isolation Valves

6. ECCS Injection Tanks

7. Hotwell Control

8. Electrical Panel

9. Feed Limiter Valve